Take a look at our latest projects!

Master Bathroom

300 SQFT bathroom renovation

  • New tub
  • New shower
  • New custom tile
  • New vanity
  • New plumbing lines
  • New Lights
  • Custom glass door
  • New tile flooring
  • New paint
  • Plumbing fixtures and bathroom hardware accessories

Range of labor and construction material cost:

$40,000 – $50,000 depending on installation materials

Before

After

Kitchen Remodeling

500 SQFT Kitchen remodel

  • All new open floor plan
  • All new prefab cabinet kitchen
  • All new luxury vinyl plank
  • New water lines for espresso machine
  • New electrical for wine fridge, drawer microwave
  • New drop down range hood vent
  • New appliances
  • Plumbing reconfiguration on raised foundation
  • New lighting, recessed and pendants
  • Black hardware finishes
  • Custom tile backsplash
  • Waterfall peninsulas

Range of labor and construction material cost:

$60,000 – $65,000 depending on installation materials

Before

After

Simple Bathrooms

40 SQFT bathroom renovation

  • New tub-to-shower conversion
  • New custom tile
  • New vanity
  • New plumbing lines
  • New Light on top of shower
  • Off-the-shelve glass door
  • New tile flooring
  • New paint
  • Plumbing fixtures and bathroom hardware accessories
  • New toilet

Range of labor and construction material cost:

$15,000 – $20,000 depending on installation materials

Before

After

Full Remodel

1700 SQFT remodel

  • New prefab kitchen
  • Stainless Steel Appliances
  • New AC condenser
  • All new Luxury Vinyl Plank
  • All New two story Deck overseeing canyon
  • All New master bedroom and bathroom
  • All New hallway bathroom
  • Open floor plan
  • New electrical panel and lights, recessed and pendants
  • Two new sliding doors
  • All New construction windows
  • All new laundry room
  • All custom tile
  • All new baseboards
  • All new interior and exterior paint
  • New front landscaping with irrigation

Range of labor and construction material cost:

$200,000 – $250,000 depending on installation materials

Before

After

5/5